| Length | 1500 | 1800 | 2000 | 2300 | 2500 | 2700 | 3000 | 3300 |
| Beam Specification | Load/kg | |||||||
| 80×50 | 3000 | 2300 | 1800 | 1500 | 1200 | 1000 | 800 | 700 |
| 100×50 | 4000 | 4000 | 3000 | 2400 | 2000 | 1750 | 1400 | 1100 |
| 120×50 | 4000 | 4000 | 4000 | 3500 | 3000 | 2500 | 2000 | 1800 |
| 140×50 | 4000 | 4000 | 4000 | 4000 | 4000 | 3800 | 3000 | 2500 |
With widened and thickened design, the contact area between the welding pad and the ground is large, which enhances the friction with the ground and is more stable.
It adopts a new design, which is reasonably inserted into the kit on the beam, which is more convenient to disassemble and assemble, and the layer height can be adjusted at will.
After welding, the screws are reinforced, the connection between the shelves is more firm, and the goods are not afraid of falling off even if they are heavy.
Welding and rolling reinforced ribs can be welded under the beam to enhance its bearing capacity and make the beam difficult to deform.















We are a professional manufactory for storage racks and industrial shelving systems.
Our factory is located in Nanjing City, Jiangsu Province, China. You can fly to Nanjing Airport directly, and we will pick you up at Nanjing Lukou International Airport. All our clients, from home or abroad, are warmly welcome to visit us.
The primary material we choose for our heavy-duty racking is high-grade Q235 steel.
Standard export package. All structural parts are securely packed by steel belts and completely covered by protective plastic film.
Payment terms: (1) T/T payment (2) LC at sight. Delivery time normally ranges from 15 to 30 days after receipt of deposit, depending on order volume and racking configurations.
Yes, short section samples can be provided free of charge, with international courier costs to be borne by clients.