[email protected] Serving West, East, Southern & North Africa

Bule Orange Custom Design Corrosion Protection Medium Duty Storage Racks Boltless Shelving Heavy Duty Shelf

Product Description

Storage Racks Overview
Product Description
Bule Orange Custom Design Corrosion Protection Medium Duty Storage Racks Boltless Shelving Heavy Duty Shelf
Storage Racks Design
Storage Racks Structural Detail
Specification
Length 1500 1800 2000 2300 2500 2700 3000 3300
Beam Specification Load / kg
80×50 3000 2300 1800 1500 1200 1000 800 700
100×50 4000 4000 3000 2400 2000 1750 1400 1100
120×50 4000 4000 4000 3500 3000 2500 2000 1800
140×50 4000 4000 4000 4000 4000 3800 3000 2500
Advantages of Heavy Duty Racking :
  • ✓ It is suitable to be used in factories, manufactures and warehouse
  • ✓ Size(L*W*H): 1200/1500/2000*450/600/1000*1800/2000/2500mm, customizable size
  • ✓ Perfect for storing categorized products in a neat and tidy way
  • ✓ Heavy-duty shelf set for warehouse shelving
  • ✓ Strong structure
  • ✓ Easy installation
  • ✓ Customization is acceptable
Widened welding land

Widened welding land

With widened and thickened design, the contact area between the welding pad and the ground is large, which enhances the friction with the ground and is more stable

Articulation design

Articulation design

It adopts a new design, which is reasonably inserted into the kit on the beam, which is more convenient to disassemble and assemble, and the layer height can be adjusted at will.

Reinforcement welding

Reinforcement welding

After welding, the screws are reinforced, the connection between the shelves is more firm, and the goods are not afraid of falling off even if they are heavy.

The beam is stronger

The beam is stronger

Welding and rolling reinforced ribs can be welded under the beam to enhance its bearing capacity and make the beam difficult to deform.

Product Diagram
Product Solutions
Company Profile
Nanjing Jinhui Storage Equipment Co., Ltd.
Anhui Industry Park

Anhui industry park

Area: 40000 m2
Employee: more than 50

Nanjing Industry Park

Nanjing industry park

Area: 20000 m2
Employee: more than 50

• Company Profile Video

We established in 2006, is a professional engaged in the research, development, sale and service of pallet racking, mezzanine floor, cantilever racking, light and middle duty shelving, steel pallet.

We are located in Nanjing city with convenient transportation access. We are rich of know-how equipped with advanced streamlined product line. Besides an sophisticated team of installing and after service guarantee a happy experience of our product. Dedicated to strict quality control and thoughtful customer service, our experienced staff members are always available to discuss your requirements and ensure full customer satisfaction.

In addition, we have obtained CE, ISO9001, ISO14001 and TUV certificates. Selling well in all cities and provinces around China, our products are also exported to clients in such countries and regions as Asia, North America, South America, Africa. We also welcome OEM and ODM orders.

Company Facility 1
Company Facility 2
Company Facility 3
Factory Facility
Packing & Delivery

To better ensure the safety of your goods, professional, environmentally friendly, convenient and efficient packaging services will be provided.

Packaging Process 1
Packaging Process 2
Delivery Loading
Certificate
Certificate 1
Certificate 2
Certificate 3
Joint Venture
Joint Venture Showcase 1
Joint Venture Showcase 2
Joint Venture Showcase 3
FAQ
Q1 Are you a factory or trading company?
A: We are a manufactory for storage rack.
Q2 Where is your factory located? How can I visit there?
A: Our factory located in Nanjing City, Jiangsu Province, China. You can fly to Nanjing airport directly. We will pick you up at Nanjing international airport. All our clients, from home or abroad, are warmly welcome to visit us.
Q3 What is the raw material of your products?
A: The material we choose is Q235 steel.
Q4 What is the packaging of the products?
A: Standard export package. All parts are packed by steel belt and covered by plastic film.
Q5 What is the term of payment?
A: (1) T/T payment. (2) LC at sight.
Q6 What is your delivery time and loading port?
A: The loading port is Nanjing or Shanghai port. Delivery time depends on the order quantity and racking types, normally is 15 to 30 days after receipt of the deposit.

Related Products